The Ribbon at Darling Harbor, Sydney, was a transformative project designed to enhance the area’s accessibility and functionality. Our comprehensive scope of works included:
Demolition of All Existing Pavement & Removal Off-Site: We commenced with the careful demolition of all existing pavement, ensuring safe removal from the site to prepare for the new construction.
Supply, Place, and Compact Subgrade and DGB: Our team supplied, placed, and compacted the subgrade and Dense Graded Base (DGB), creating a solid and durable foundation for the new pavement structures.
Trim to Design Levels and Suit All Grades: We expertly trimmed the site to meet specified design levels, ensuring compatibility with all grades and seamless integration with existing infrastructure.
Supply & Install Stormwater Pipes and Pits: To effectively manage water drainage, we supplied and installed high-quality stormwater pipes and pits, designed to reduce flooding and promote environmental sustainability.
Construct New Carpark/Roadway into Main Entrance of TFNSW Road: Our work included the construction of a new carpark and roadway, providing essential access to the main entrance of the Transport for NSW (TFNSW) road, thereby improving traffic flow and visitor experience.
All Survey and Excavations for Concrete Detail, Light Pole, Playground Equipment: We conducted thorough surveys and excavations to facilitate the installation of concrete detail, light poles, and playground equipment, ensuring all elements were precisely positioned and compliant with safety standards.
The Ribbon project embodied our commitment to delivering high-quality civil works that enhanced public spaces while prioritising safety and efficiency. Our experienced team dedicated itself to executing this project with precision and professionalism, contributing to the ongoing development and beautification of Darling Harbor.
Client
Multiplex
Location
Darling Harbor, Sydney
Category
Pavement, Stormwater Management System, Carpark and Road Way, Survey & Excavations
Value
$5.5 mil
Primary scope of works include:
- Demo of all existing pavement & remove off site
- Supply, Place, Compact of Subgrade and DGB
- Trim to design levels and suit all grades.
- Supply & install stormwater pipes and pits
- Construct new carpark/road way into main entrance of TFNSW road
- All survey and excavations for concrete detail, light pole, playground equipment.
- Supply, Place, Compact of Subgrade and DGB
- Trim to design levels and suit all grades.
- Supply & install stormwater pipes and pits
- Construct new carpark/road way into main entrance of TFNSW road
- All survey and excavations for concrete detail, light pole, playground equipment.